MANHOLE & WATER
VALVE BOX INSERTS

Plastic Manhole Insert
Manhole Insert- V2P
Stainless Steel Insert
Valve Box Insert
Odoreater Insert
Inflow Cost Analysis

MANHOLE REHAB
PRODUCTS

MANHOLE REHAB
APPLICATION EQUIPMENT

MANHOLE CHIMNEY
& JOINT SEALANTS

MANHOLE ODOR CONTROL

VOLUMETRIC WEIRS

PAVING RISERS

ADDITIONAL PRODUCTS
Rap-O Manhole Cover Cushion
Manhole Cover Extractor
Manhole Lid Puller
Manhole Steps

ENGINEERING SPECS

ENGINEERING SPECIFICATIONS
Manhole Rehabilitation Specifications / Chemical Grouting Specifications

 

TECHNICAL AND PROPERTY SPECIFICATIONS
FOR MANHOLE REHABILITATION

Printable version for Manhole Rehabilitation Specifications

(1) Intent and Method of Manhole Rehabilitation.
Each indicated concrete or brick structure shall be rehabilitated to eliminate infiltration and exfiltration, restore structural integrity and protect the structure from further deterioration. All products to be used in the rehabilitation system shall be supplied by a single supplier to insure material compatibility. Contractors bidding on the rehabilitation project(s) must demonstrate that they are qualified by experience and must be trained and licensed to apply the specified products.

(2) Materials: The materials used shall be designed, manufactured, and intended for manhole and sewer structure rehabilitation and the specific application in which they are used. The materials shall be delivered to the job site in original unopened packages and clearly labeled with the manufacturer's identification and printed instructions. All material shall be stored and handled in accordance with recommendation of the manufacturer and the American Concrete Institute.

(3) Execution: Manholes requiring rehabilitation are listed or tabulated in the contract documents. The list will identify and locate the manholes to be rehabilitated and the type of rehabilitation required for each manhole.

     (3.1) Surface Preparation shall consist of water blasting (minimum 3500 psi) the interior of the manhole or structure in order to accomplish the removal of loose mortar, paints, protective coatings, efflorescence, all contaminants, laitance and curing components, leaving a clean, structurally sound substrate. Wire brushing or sand blasting may be required.

     (3.2) Hydrostatic Leak Correction. All active leaks shall be stopped using one of the following products. Please refer to product sheets or contact manufacturer to assist with product selection.

PARSON QUICK PLUG
Set time ASTM C-191
Compressive Strength ASTM C-109
15 Minutes
1 Day
28 Days

60 seconds

750 psi
3700 psi
5500 psi

PARSON HYDRO GROUT
Viscosity
Density
Elongation
Tensile Strength
Shear Strength
Water Absorption
100 cps @77°F
4 lbs/cu. ft.
50%
27 psi
20 psi
< 1 % by volume
ASTM D-1638
ASTM D-1622
ASTM D-638
ASTM D-638
ASTM D-732
ASTM D-2842

PARSON MULTI GROUT
Viscosity
Density
Elongation
Tensile Strength
Tear Strength

600 cps @77°F
65 lbs/cu. ft.
400%
2200 psi
400 psi

ASTM D-1638
ASTM D-1622
ASTM D-638
ASTM D-638
ASTM D-624


PARSON PERMA SEAL
Viscosity
Density
Elongation
Tensile Strength
Shear Strength

500 cps @77°F
5 lbs/cu. ft.
400%
370 psi
170 psi

ASTM D-1638
ASTM D-1622
ASTM D-638
ASTM D-638
ASTM D-732

        



BACK TO TOP